China’s professional mold manufacturing plant for different plastic products

China’s professional mold manufacturing plant for different plastic products

Short Description:

We promise Professional mold making experience, excellent service, perfect transaction process, serious work attitude
Brand P&M
Mould Time 25 working days
Mould material P20,2738,2344,718,S136,8407,NAK80,SKD61,H13
Base material ABS,PP,PC,PA6,PA66,TPU,POM,PBT,PVC,HIPS,PMMA,TPE,PC/ABS, TPV, TPO,T PR,EVA,HDPE,LDPE,CPVC,PVDF,PPSU.PPS.
Producing Process Quotation-Customer Order-Discuss the best solution-Layout drawing-Drawing approval-Material purchase-Mold Production-Mold sampling and correction-

Sent T1 sampling to customer with inspection report-Customer Feedback-

Customer approval-First batch production

Quality system ISO9001


Product Detail

Product Tags

Google-14Google-29 Google-28plastic mould-19 plastic mould-14 plastic mould-11

Tips:

We can provide one-stop service, can make the mold you want, please send me the drawing,

I will give you a suitable quotation, and provide you with better service.

Please contact us!

Google-4Google-25Google-24Google-22Google-23plastic mould-63Google-26

Tips:

We can provide all international express delivery methods, and choose the most suitable

and convenient express delivery method according to your timeliness.

Usually the molds are shipped by sea, and the products are selected according to the required timeliness.

Google-7Google-8Google-9

Q1: Are you trading company or manufacturer ?
A: We are manufacturers.

Q2. When can I get the quotation?
A: We usually quote within 2 days after we get your inquiry.
If you are very urgent, please call us or tell us in your email so that we can quote for you first.

Q3. How long is the lead-time for mold?
A: It all depends on the products’ size and complexity. Normally, the lead time is 25 days.

Q4. I have no 3D drawing, how should I start the new project?
A: You can supply us a molding sample, we will help you finish the 3D drawing design.

Q5. Before shipment, how to make sure the products quality?
A: If you don’t come to our factory and also don’t have the third party for inspection, we will be as your inspection worker.
We will supply you a video for production process detail include process report, products size structure and surface detail, packing detail and so on.

Q6. What is your payment terms?
A: Mold Payment: 30% deposit by T/T in advance, sending out the first trial samples, 70% mold balance after you agree the final samples.
B:Production Payment: 50% deposit in advance, 50% before sending out the final goods.

 


  • Previous:
  • Next:

  • Related Products