Factory Supply Mold Factory - Oem high precision cups plastic chocolate box luer slip syringe air ejector plastic injection molding – Plastic Metal
Factory Supply Mold Factory - Oem high precision cups plastic chocolate box luer slip syringe air ejector plastic injection molding – Plastic Metal Detail:
We have more than 10 years of mold making experience and 8 years of foreign trade experience.
Hundreds of professional engineers and designers, as well as excellent foreign trade salesmen.
To provide customers with professional, attentive and serious service.
1.Product display
We customize many different types of plastic parts for our customers, covering a wide range of fields.
We choose the most suitable product materials and mold materials for customers according to the customer’s use site and purpose.
We have made many silicone molds and products, such as chocolate molds, cake molds.
There are also many precision molds, such as auto parts molds, various water pump molds. We have enough experience to complete your product.
2.Mold processing
Basic mold material: 45 gauge steel, P20, 718, 718H, S316
Corresponding mold life:10,000 products, 150,000 products, 300,000 products, 500,000 products, 1 million products. (Cavity is 1 cavity)
Mold making time: 25 working days
Product production time: 7-15 days (depending on the number of products)
3.Transaction process
4.Transportation
5.Factory
6.Certificate
In addition to certificates, we have more than 20 invention patents, and our factory is also seeking greater technological breakthroughs.
And the quality of our products can be guaranteed to be certified by almost all agencies in the world.
7.Customer visit
FQA
Q1: Are you trading company or manufacturer ?
A: We are manufacturers.
Q2. When can I get the quotation?
A: We usually quote within 2 days after we get your inquiry.
If you are very urgent, please call us or tell us in your email so that we can quote for you first.
Q3. How long is the lead-time for mold?
A: It all depends on the products’ size and complexity. Normally, the lead time is 25 days.
Q4. I have no 3D drawing, how should I start the new project?
A: You can supply us a molding sample, we will help you finish the 3D drawing design.
Q5. Before shipment, how to make sure the products quality?
A: If you don’t come to our factory and also don’t have the third party for inspection, we will be as your inspection worker.
We will supply you a video for production process detail include process report, products size structure and surface detail, packing detail and so on.
Q6. What is your payment terms?
A: Mold Payment: 30% deposit by T/T in advance, sending out the first trial samples, 30% mold balance after you agree the final samples.
B:Production Payment: 30% deposit in advance, 70% before sending out the final goods.
Q7: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit for best quality products .
2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.
Product detail pictures:
Related Product Guide:
Cooperation
Adhering for the theory of "quality, services, performance and growth", we have received trusts and praises from domestic and worldwide shopper for Factory Supply Mold Factory - Oem high precision cups plastic chocolate box luer slip syringe air ejector plastic injection molding – Plastic Metal, The product will supply to all over the world, such as: India, Moldova, Mauritius, In order to carry out our goal of "customer first and mutual benefit" in the cooperation, we establish a specialist engineering team and a sales team to supply the best service to satisfy our customers' requirements. Welcome you to cooperate with us and join us. We have been your best choice.
By ron gravatt from Madrid - 2018.12.05 13:53
It is a very good, very rare business partners, looking forward to the next more perfect cooperation!
By Mag from Liberia - 2017.10.27 12:12