Plastic gear cup bottle enclosure oil funnel silicone spoon mold suppliers

Plastic gear cup bottle enclosure oil funnel silicone spoon mold suppliers

Short Description:

Business type Plastic gear cup bottle  enclosure oil funnel silicone spoon mold suppliers
Product New Plastic Mould For Pipe Fitting
Surface treatment Painting,polishing,electroplating,chrome plating,powder coating
Customized support OEM, ODM, OBM
Material plastic(PC,PA66,ABS etc),metal(Satinless Steel) both ok
Production Process 1.Mould Making — 2.Samples Making — 3.Samples Confirming –4.Production Check — 5.Trimming –6.Final Quality Inspection — 7.Packing — 8.Shipment
You may Provide 2Ddrawing, 3Ddrawing, samples, or the size of the multi-angle pictures
Machining type Injection molding, compression molding, stamping, blow molding


Product Detail

Product Tags

Plastic gear cup bottle  enclosure oil funnel silicone spoon mold suppliers

1.Product

mould-1 mould-2 plastic mould-42 plastic mould-24

硅胶-2

2.Mould

Google-2 Google-3 A-15

3.Mold processing

1324 new Google-57 76

Mold production time is about 25 days to complete,
The production time of general plastic products is about 5-7 days.
If printing is required, the printing time is about 7-9 days to complete

4.Transaction process

微信图片_20210610165052

Our transaction flow is roughly
1. You pay the deposit, we start to make the mold
2. After the mold is completed, we will send you the sample.
3. After the sample is passed, you pay the balance and we start to produce the product.
4. After the production of the product is completed, you pay the freight and we will arrange the transportation for you.

5.Shipping and Packaging

new Google-60

We can provide all international express delivery methods, and choose the most suitable and convenient express delivery method according to your timeliness.

Usually the molds are shipped by sea, and the products are selected according to the required timeliness.
We can also send the goods to your Chinese freight forwarder, the time is about 2-3 days to arrive

6.Factory

plastic mould-104  new Google-62 new Google-65 new Google-64

7.Certificate

Google-8

FQA

Q1: Are you trading company or manufacturer ?
   A: We are manufacturers.
   
Q2. When can I get the quotation?
   A: We usually quote within 2 days after we get your inquiry.
   If you are very urgent, please call us or tell us in your email so that we can quote for you first.
   
   
Q3. How long is the lead-time for mold?
   A: It all depends on the products’ size and complexity. Normally, the lead time is 25 days.
   
Q4. I have no 3D drawing, how should I start the new project?
   A: You can supply us a molding sample, we will help you finish the 3D drawing design.
   
Q5. Before shipment, how to make sure the products quality?
   A: If you don’t come to our factory and also don’t have the third party for inspection, we will be as your inspection worker.
   We will supply you a video for production process detail include process report, products size structure and surface detail, packing detail and so on.
   
Q6. What is your payment terms?
   A: Mold Payment: 40% deposit by T/T in advance, 30% second mold payment before sending out the first trial samples, 30% mold balance after you agree the final samples.
   B:Production Payment: 50% deposit in advance, 50% before sending out the final goods.
   
   
Q7: How do you make our business long-term and good relationship?
   A:1. We keep good quality and competitive price to ensure our customers benefit for best quality products .
   2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.


  • Previous:
  • Next:

  • Related Products