P&M Auto Accessories Plastic Parts LED Rear Light Tail Lamp Mould With Stop Light Signal Lamp Tooling Maker
Yuyao Cixi Ningbo Zhejiang abs parts and Plastic injection molding
Item: ningbo Mold/Plastic Mould /Injection plastic mold/Plastic injection molding/ Plastic Injection Mould /mould maker/printer mould/ Plastic toolings maker Specifications.
1. About our company
1) We have been doing professional bearing parts and bearing partsing products for 14 years, equipped with 30 sets mold processing equipment, proffessional CAD, CAM, CAE technology and special testing equipment.
2) 2012 three-star mold Factory.
3) Our die include: auto parts, household appliances, medical equipment, House application products, electronic and electrical appliances, handicrafts and engineering construction etc…
4) We will Quote you our best price on time, please provide detailed information when send inquiry.
5) please inform the molding material, weight, annual purchase quantity, target completion time and other special requirements (eg: UV, VO, painting, chrome, screen printing, assembly and so on).
2.Discription of bearing parts
Item | Signal Light Plastic Mould |
Mould Time | 20-35 Days |
Product time | 7-15 Days |
Moud precision | +/-0.01mm |
Mould life | 50-100 million shots |
Mould material | P20,2738,2344,718,S136,8407,NAK80,SKD61,H13 |
Mould cavity | One cavity, multi-cavity or same different products be made together |
Runner system | Hot runner , Cold runner |
Surface treatment | Words corrosion,Mirror polish,Frosted surface,Dermatoglyph |
Mould standard | HASCO,DME or according to custom’s request |
Main process | Milling,grinding,CNC,EDM,wire-electrode cutting, carved,
electrospark,lathe,surface treatment |
Plastic Injection Mould making
1.Samples/Drawing &Requirement from you
2.Mould design:we will Communicate and Exchange the opinion with you after you place order.
3.Material Purchase:Steel cutting and Mould base tooling.
4.Assembling.
5.Inspection of mould : following and controlling the tooling processing.
6.Mould testing:We will inform you the date.Than will send the sample’s inspection report&injection parameters with the sample to you!
7.Your instruction &confirmation for shipment.
8.Ready made mould before packing.
9.We provide any differeny kinds of plastic injection mould, blow mould, silicone mould, die casting mould service.
3.Pictures of bearing parts
5. Shipment of bearing parts
1.By air ,it takes 3-7 days for delivery .The goods can be shipped by DHL ,Fedex ,UPS .
2.By sea ,the delivery time is based on your port .
To South East Asian Countries takes about 5-12 days
To Middle east countries takes about 18-25 days
To European countries takes about 20-28 days
To American countries takes about 28-35 days
To Australia takes about 10-15 days
To African countries takes about 30-35 days.
6.Service of bearing parts
1. Your inquiry related to our products or prices will be replied within 24hours
2. Well-trained and experienced staffs to answer all your enquiries in fluent English.
3. Offering the support to solve the problem in the application or selling period.
4. Competitive prices based on same quality.
5. Guarantee samples quality same as mass production quality.