P&M Professional Plastic Connector Mould
Our advantage
1.14 years of experience in mold making.
2.2 large factories, reasonable factory personnel deployment system, and efficient production efficiency.
3. Hundreds of professional engineers and designers, one-to-one salesman service.
4. Hundreds of high-end equipment, high-quality mold raw materials.
5. The salesman’s efficient work efficiency and high-quality service.
our service
1. Mold making type: die casting, injection molding, blow molding.
2. Process type: slider, inclined top, cold runner, hot runner, 3D printing, etc.
3. Technical type: technical consultation, 3D drawing design and production, material inspection, etc.
4. Business type: mold quotation, transportation method query, invoice, bill of lading, etc.
Product details
Production process
Part of the equipment list
No. | Name | MODEL TYPE | Quantity | original place |
NO-1 | Machining Center | VB1600 | 1 | China Taiwan |
NO-2 | Machining Center | VB1100 | 1 | China Taiwan |
NO-3 | Surface Grinder | KGS-618M | 1 | China Mainland |
NO-4 | Engraving machine | DC-50A | 1 | China Mainland |
DC-42A | 1 | China Mainland | ||
NO-5 | Universal Milling Machine | N-4M | 1 | China Mainland |
NO-6 | radial drill | ZY3725 | 1 | China Mainland |
Z3050 | 1 | China Mainland | ||
NO-7 | wire cut | DK7740 | 5 | China Mainland |
NO-8 |
EDM |
7145 | 2 | China Mainland |
7125 | 1 | China Mainland | ||
500 | 1 | China Mainland | ||
NO-9 | Injection Machine 120G | 120G | 1 | China Taiwan |
NO-10 | Injection Machine 300G | 300G | 3 | China Taiwan |
Mode of transport
We can provide basic express service methods. Choose express delivery according to the timeliness you need. The fast one takes about 4-9 working days,
and the slow one takes 30 working days
Certificate
Customer visit
FQA
Q1: Are you trading company or manufacturer ?
A: We are manufacturers.
Q2. When can I get the quotation?
A: We usually quote within 2 days after we get your inquiry.
If you are very urgent, please call us or tell us in your email so that we can quote for you first.
Q3. How long is the lead-time for mold?
A: It all depends on the products’ size and complexity. Normally, the lead time is 25 days.
Q4. I have no 3D drawing, how should I start the new project?
A: You can supply us a molding sample, we will help you finish the 3D drawing design.
Q5. Before shipment, how to make sure the products quality?
A: If you don’t come to our factory and also don’t have the third party for inspection, we will be as your inspection worker.
We will supply you a video for production process detail include process report, products size structure and surface detail, packing detail and so on.
Q6. What is your payment terms?
A: Mold Payment: 40% deposit by T/T in advance, 30% second mold payment before sending out the first trial samples, 30% mold balance after you agree the final samples.
B:Production Payment: 50% deposit in advance, 50% before sending out the final goods.
Q7: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit for best quality products .
2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.