P&M professional Plastic Moulding For Frame maker

P&M professional Plastic Moulding For Frame maker

Short Description:

Business type Plastic Moulding For Frame
Product Plastic Moulding For Frame
Surface treatment Painting,polishing,electroplating,chrome plating,powder coating
Customized support OEM, ODM, OBM
Material plastic(PC,PA66,ABS etc),metal(Satinless Steel) both ok
Production Process 1.Mould Making — 2.Samples Making — 3.Samples Confirming –4.Production Check — 5.Trimming –6.Final Quality Inspection — 7.Packing — 8.Shipment
You may Provide 2Ddrawing, 3Ddrawing, samples, or the size of the multi-angle pictures
Machining type Injection molding, compression molding, stamping, blow molding


Product Detail

Product Tags

Our advantage
1.14 years of experience in mold making.
2.2 large factories, reasonable factory personnel deployment system, and efficient production efficiency.
3. Hundreds of professional engineers and designers, one-to-one salesman service.
4. Hundreds of high-end equipment, high-quality mold raw materials.
5. The salesman’s efficient work efficiency and high-quality service.

our service
1. Mold making type: die casting, injection molding, blow molding.
2. Process type: slider, inclined top, cold runner, hot runner, 3D printing, etc.
3. Technical type: technical consultation, 3D drawing design and production, material inspection, etc.
4. Business type: mold quotation, transportation method query, invoice, bill of lading, etc.

Product details

plastic mould-70 plastic mould-71 plastic mould-72 plastic mould-73

We have done different types of mold making cases, have rich production experience, and have professional designers and engineers.

The most important thing is that we have high-end equipment. The molds produced are all high-quality, and the products produced are also very high-quality.
If our case does not have the mold type you want, you can contact us and we will give you a professional answer.

G929-d8

Production process

new Google-57

new-14

We have two factories and these are part of the production process of our two factories.

Our engineers are very careful about every production process to prevent any problems.

Mode of transport

new Google-67

We can carry out sea transportation, air transportation and rail transportation according to customers’ requirements

Customer visit

new-12

Certificate

new-11 new-10

We also have dozens of technical patents and other certificates, here are just some of the certificates

FQA

Q1: Are you trading company or manufacturer ?
   A: We are manufacturers.
   
Q2. When can I get the quotation?
   A: We usually quote within 2 days after we get your inquiry.
   If you are very urgent, please call us or tell us in your email so that we can quote for you first.
   
   
Q3. How long is the lead-time for mold?
   A: It all depends on the products’ size and complexity. Normally, the lead time is 25 days.
   
   
Q4. I have no 3D drawing, how should I start the new project?
   A: You can supply us a molding sample, we will help you finish the 3D drawing design.
   
Q5. Before shipment, how to make sure the products quality?
   A: If you don’t come to our factory and also don’t have the third party for inspection, we will be as your inspection worker.
   We will supply you a video for production process detail include process report, products size structure and surface detail, packing detail and so on.
   
Q6. What is your payment terms?
   A: Mold Payment: 40% deposit by T/T in advance, 30% second mold payment before sending out the first trial samples, 30% mold balance after you agree the final samples.
   B:Production Payment: 50% deposit in advance, 50% before sending out the final goods.
   
   
Q7: How do you make our business long-term and good relationship?
   A:1. We keep good quality and competitive price to ensure our customers benefit for best quality products .
   2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.


  • Previous:
  • Next:

  • Related Products