Prefessional Plastic Injection Mould Part
Ningbo P&M Plastic Metal Product Co., Ltd. We main do all kinds of 3d design, 3d printing and plastic metal molds tooling and products. We have our own engineer and factory, so that we can customer any plastic and metal products for our customer .
Our advantage
1.14 years of experience in mold making.
2.2 large factories, reasonable factory personnel deployment system, and efficient production efficiency.
3. Hundreds of professional engineers and designers, one-to-one salesman service.
4. Hundreds of high-end equipment, high-quality mold raw materials.
5. The salesman’s efficient work efficiency and high-quality service.
Our service
1. Mold making type: die casting, injection molding, blow molding.
2. Process type: slider, inclined top, cold runner, hot runner, 3D printing, etc.
3. Technical type: technical consultation, 3D drawing design and production, material inspection, etc.
4. Business type: mold quotation, transportation method query, invoice, bill of lading, etc.
Product details
We can provide one-stop service, can make the mold you want,
please send me the drawing, I will give you a suitable quotation,
and provide you with better service.
Please contact us!
Factory
Transport and packaging
Packaging according to your needs:
Mold packaging generally choose wooden box packaging, products choose carton packaging
We can provide all international express delivery methods, and choose the most suitable and
convenient express delivery method according to your timeliness. Usually the molds are shipped by sea,
and the products are selected according to the required timeliness.
1.By air ,it takes 3-7 days for delivery .The goods can be shipped by DHL ,Fedex ,UPS.
2.By sea, the delivery time is based on your port.
To South East Asian Countries takes about 5-12 days
To Middle east countries takes about 18-25 days
To European countries takes about 20-28 days
To American countries takes about 28-35 days
To Australia takes about 10-15 days
To African countries takes about 30-35 days.
Certificate
Customer visit
FQA
Q1: Are you trading company or manufacturer ?
A: We are manufacturers.
Q2. When can I get the quotation?
A: We usually quote within 2 days after we get your inquiry.
If you are very urgent, please call us or tell us in your email so that we can quote for you first.
Q3. How long is the lead-time for mold?
A: It all depends on the products’ size and complexity. Normally, the lead time is 25 days.
Q4. I have no 3D drawing, how should I start the new project?
A: You can supply us a molding sample, we will help you finish the 3D drawing design.
Q5. Before shipment, how to make sure the products quality?
A: If you don’t come to our factory and also don’t have the third party for inspection, we will be as your inspection worker.
We will supply you a video for production process detail include process report, products size structure and surface detail, packing detail and so on.
Q6. What is your payment terms?
A: Mold Payment: 30% deposit by T/T in advance, sending out the first trial samples, 30% mold balance after you agree the final samples.
B:Production Payment: 30% deposit in advance, 70% before sending out the final goods.
Q7: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit for best quality products .
2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.