Super Lowest Price 3d Mold Silicone - New Plastic Mould For Pipe Fitting – Plastic Metal

Super Lowest Price 3d Mold Silicone - New Plastic Mould For Pipe Fitting – Plastic Metal

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We are proud of the high customer satisfaction and wide acceptance due to our persistent pursuit of high quality both on product and service for Plastic Products Mould, Case Mold Customized, Eyeglass Case Mold, We are glad that we are steadily growing with the active and long term support of our satisfied customers!
Super Lowest Price 3d Mold Silicone - New Plastic Mould For Pipe Fitting – Plastic Metal Detail:

Corporate Philosophy

P&M started domestic business from 2008,named Shundi Mould Factory. And opened the international market from 2014. We always adhere to the principles of quality first and time first. While providing customers with the highest quality products, try to maximize the production efficiency and shorten production time. We are proud to tell every customer that our company has not lost any customer since its establishment.If there is a problem with the product, we will seek a solution actively and take responsibility to the end.

Our advantage
1.14 years of experience in mold making.
2.2 large factories, reasonable factory personnel deployment system, and efficient production efficiency.
3. Hundreds of professional engineers and designers, one-to-one salesman service.
4. Hundreds of high-end equipment, high-quality mold raw materials.
5. The salesman’s efficient work efficiency and high-quality service.

Product details

plastic mould-94 plastic mould-93 plastic mould-86 plastic mould-64 plastic mould-63 mould7

Equipment List

Google-22 Google-23

new Google-57 new-14

Plastic Injection Mould making
1.Samples/Drawing &Requirement from you
2.Mould design:we will Communicate and Exchange the opinion with you after you place order.
3.Material Purchase: Steel cutting and Mould base tooling.
4.Assembling.
5.Inspection of mould: following and controlling the tooling processing.
6.Mould testing:We will inform you the date.Than will send the sample’s inspection report&injection parameters with the sample to you!
7.Your instruction &confirmation for shipment.
8.Ready made mould before packing.
9.We provide any differeny kinds of plastic injection mould, blow mould, silicone mould, die casting mould service.

Factory

new Google-40 new Google-41 new Google-62 new Google-64 new Google-65

Transport and packaging

new Google-67 plastic mould-87

Packaging according to your needs
1.By air ,it takes 3-7 days for delivery .The goods can be shipped by DHL ,Fedex ,UPS.
2.By sea, the delivery time is based on your port.
  To South East Asian Countries takes about 5-12 days
  To Middle east countries takes about 18-25 days
  To European countries takes about 20-28 days
  To American countries takes about 28-35 days
  To Australia takes about 10-15 days
  To African countries takes about 30-35 days.

Certificate

new-11 new-10

FQA

Q1: Are you trading company or manufacturer ?
   A: We are manufacturers.
   
Q2. When can I get the quotation?
   A: We usually quote within 2 days after we get your inquiry.
   If you are very urgent, please call us or tell us in your email so that we can quote for you first.
   
Q3. How long is the lead-time for mold?
   A: It all depends on the products’ size and complexity. Normally, the lead time is 25 days.
   
Q4. I have no 3D drawing, how should I start the new project?
   A: You can supply us a molding sample, we will help you finish the 3D drawing design.
   
Q5. Before shipment, how to make sure the products quality?
   A: If you don’t come to our factory and also don’t have the third party for inspection, we will be as your inspection worker.
   We will supply you a video for production process detail include process report, products size structure and surface detail, packing detail and so on.
Q6. What is your payment terms?
   A: Mold Payment: 30% deposit by T/T in advance, sending out the first trial samples, 30% mold balance after you agree the final samples.
   B:Production Payment: 30% deposit in advance, 70% before sending out the final goods.   
Q7: How do you make our business long-term and good relationship?
   A:1. We keep good quality and competitive price to ensure our customers benefit for best quality products .
   2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.

 

 


Product detail pictures:

Super Lowest Price 3d Mold Silicone - New Plastic Mould For Pipe Fitting – Plastic Metal detail pictures

Super Lowest Price 3d Mold Silicone - New Plastic Mould For Pipe Fitting – Plastic Metal detail pictures

Super Lowest Price 3d Mold Silicone - New Plastic Mould For Pipe Fitting – Plastic Metal detail pictures

Super Lowest Price 3d Mold Silicone - New Plastic Mould For Pipe Fitting – Plastic Metal detail pictures

Super Lowest Price 3d Mold Silicone - New Plastic Mould For Pipe Fitting – Plastic Metal detail pictures

Super Lowest Price 3d Mold Silicone - New Plastic Mould For Pipe Fitting – Plastic Metal detail pictures


Related Product Guide:
Cooperation

We rely upon strategic thinking, constant modernisation in all segments, technological advances and of course upon our employees that directly participate in our success for Super Lowest Price 3d Mold Silicone - New Plastic Mould For Pipe Fitting – Plastic Metal, The product will supply to all over the world, such as: Norwegian, Grenada, Hanover, Our company always concentrate on the development of the international market. We have a lot of customers in Russia , European countries, the USA, the Middle East countries and Africa countries. We always follow that quality is foundation while service is guarantee to meet all customers.
  • The customer service staff is very patient and has a positive and progressive attitude to our interest, so that we can have a comprehensive understanding of the product and finally we reached an agreement, thanks!
    5 Stars By Murray from Bandung - 2018.10.01 14:14
    Staff is skilled, well-equipped, process is specification, products meet the requirements and delivery is guaranteed, a best partner!
    5 Stars By Carol from Pretoria - 2018.12.25 12:43

    Related Products